Home › Systems & products › Annual rate contract

For groups, parks and repeat buyers · sites across India

One rate for every site, for twelve months

A 12-month rate for GridMats grids at all your sites in India: the annual price on every call-off, whatever its size, for 10,000 m² or ₹1 crore a year.

WhatsApp (opens in a new tab)

32 sites in 12 states since 2019. Projects →

The rates on the contract

₹ per m², ₹ per sq ft below · ex-works, ex-GST, ex-transport

ProductOn the contract
every call-off
One order
under 1,000 m²
OC-HD 40900
₹84/sq ft
1,150
₹107/sq ft
OC-LW 40550
₹51/sq ft
690
₹64/sq ft
Grass paver 30 mm430
₹40/sq ft
495
₹46/sq ft
Grass paver 20 mm370
₹34/sq ft
420
₹39/sq ft
TC mats1,950
₹181/sq ft
2,200
₹204/sq ft

The contract rate is the last column of the price ladder, the rate for an order over 25,000 m². On a rate contract it applies to every call-off, whatever its size. Prices ex-works Bengaluru; GST 18% and transport extra.

An example. A group buys 10,000 m² (about 1.08 lakh sq ft) of OC-HD 40 in a year, in eight orders of 1,250 m² (about 13,450 sq ft). Priced per order, each one falls in the 1,000–2,500 m² tier at ₹92/sq ft (₹990/m²): ₹99.0 lakh for the year. On the rate contract every call-off is at ₹84/sq ft (₹900/m²): ₹90.0 lakh, ₹9.0 lakh (9.1%) less. An OC-HD 40 call-off under 1,000 m² costs 22% less on the contract: ₹84/sq ft (₹900/m²) against ₹107/sq ft (₹1,150/m²). GST and transport extra in both.

Price your year

Your product, the area you expect to surface across all your sites in the next 12 months, and how many orders it comes in.

Your year · OC-HD 40

Priced per order₹99.0 lakh₹92/sq ft (₹990/m²), the 1,000–2,500 m² tier
On the rate contract₹90.0 lakh₹84/sq ft (₹900/m²) on every call-off

₹9.0 lakh less (9.1%) for 10,000 m² (1.08 lakh sq ft) in 8 orders of about 1,250 m² each.

Meets the commitment of 10,000 m² or ₹1 crore a year. GST and transport extra.

On the rate contract ₹90.0 lakh, ₹9.0 lakh less than priced per order.

Indicative, on the price ladder of 25 September 2026. Priced per order, each order takes the tier of its own size, one tier lower when it is delivered in more than one lot. A rate contract binds GridMats only when it is signed. Ex-works Bengaluru; GST 18% and transport extra.

What the contract gives your procurement team

One rate, every site, 12 months

The annual rate on every call-off at every site in India, whatever its size. Ex-works Bengaluru, so the product rate is the same for every state; transport is priced on each call-off.

One contract, a PO per site

Each site raises its own call-off PO quoting the contract number. Call-offs by your EPC or contractors can be written into the contract.

A rate you can budget on

The rate changes only if the polypropylene granule price index moves by more than 10%, and then by no more than 3% a change.

A design for every site

The design, the bill of quantities and the drawings from our design engine, for every site you call off.

Training and QC in the rate

Your contractor’s team trained to the GridMats SOP, and the hold-point QC, built into the rate; on site or online, as agreed in the contract.

Supply and a quarterly review

The supply date confirmed with each call-off, and a review of the account with you every quarter.

For larger contracts

Stock held for your call-offs and production set aside for your programme. These are agreed case by case, from your volume and your call-off forecast, and written into the contract.

The terms

Term
12 months from signing
Commitment
10,000 m² (about 1.08 lakh sq ft) or ₹1 crore a year
Rate
The annual rate on every call-off, any size; it changes only as above
Payment
As agreed in the contract
Prices
Ex-works Bengaluru; GST 18% and transport extra
Installation
By your contractor, trained by us, to the GridMats SOP
Approvals
You secure all approvals and permits; we work alongside your team
Defect liability
Defect liability: 1 year (DLP), our standard practice. After the training visit, your team shares project status updates (photographs, test reports, and any roadblocks or challenges) at each hold point and at the intervals set in the project agreement; the DLP applies only when these updates have been shared.

A whole park at one rate per km

For a solar, wind or logistics park: one rate per km of park road for the whole park, S1 or S2 by the traffic, priced from the park layout. Ask for the park rate (opens in a new tab).

One site first. Then a rate contract.

  1. Tell us your sites and the area you expect this year.
  2. Start with one site if you like: a free estimate and its design, at the price for its order size.
  3. We send the contract and the rate schedule for your products.
  4. Each site raises a call-off PO quoting the contract number, for any quantity, and we confirm the supply date. Every quarter we review the account with you, and before the 12 months end, the renewal.

Questions procurement asks

Can a call-off be under 1,000 m²?

Yes. Every call-off is at the annual rate, whatever its size.

Is the rate the same in every state?

Yes, the product rate is: prices are ex-works Bengaluru. Transport for each call-off is extra, with GST at 18%.

Who installs?

Your contractor, trained by us to the GridMats SOP.

Do you handle approvals?

No. You secure the approvals and permits; we work alongside your team.

32 sites in 12 states over 7 years. Clients include ABB, Radiall, JSW, Tata Steel, Bhushan and Maruti. Clients have been happy with the performance. Indian patent 398992 · GreenPro certified · base tests at IIT Hyderabad. Projects →

Ask for a rate contract

Tell us your sites and the area you expect this year. Our sales team sends the contract terms and the rate schedule for your products.

States with sites (optional)

The calculator figures above go with it. We use these details for your enquiry, as our Privacy Policy explains.

What happens next

The contract terms and your rate schedule

Our sales team reviews your sites and sends the contract and the rates for your products. Start with one site if you like: a free estimate prices it now.