S6 · Temporary roads and surfaces · Reusable · top-covered mats
Temporary roads and surfaces that go down in a day and lift for the next site
Top-covered GridMats mats, 1000 × 500 × 50 mm and about 6.5 kg each, lock together into a closed, flat surface laid straight on levelled ground, over a geotextile where the ground is soft. No infill, no curing and no concrete: the crew lays them, the traffic uses them, and they are lifted and reused on the next site. Two grades: TC Heavy Duty, in black, yellow or red, for site roads, crane access and laydown; TC Light Weight, in black, for events, footfall and light vehicles.
Get my free estimate Download the flier (PDF) (opens in a new tab) Installation at a glance (PDF) (opens in a new tab)

Top-covered GridMats mats locked together into a closed, reusable surface
Why it wins
- Laid and lifted in a day. No excavation, no base course and no concrete pad to break out afterwards.
- Reusable. The same mats move from job to job, so their cost is spread over many deployments.
- The ground is handed back clean. The mat spreads the wheel load, so soft ground and lawns are not rutted and nothing is left behind.
- Priced like a product, not a project. Buy the mats once, in colours that mark lanes, pads and walkways.
Where it fits
Construction and EPC site access · crane pads and hardstands on wind and solar sites · laydown and storage areas · event grounds and temporary parking · utility, pipeline and emergency access.
Method
Level and compact the ground, lay a geotextile where it is soft, then lock the mats edge to edge, working out from the access point. Mark lanes and pads with the mat colours. When the job ends, lift the mats in reverse order, clean them and stack them for the next site.
Choose S6 when
- Temporary access, crane pads, laydown and events
- The surface must be lifted and reused on the next site
- No permanent construction is allowed
Not ideal when
- A permanent road or yard: choose S1 or S2
- Soft ground that has not been levelled and compacted
What we need from you
- Area: length × width, or m²
- Location: city or a map pin
- Heaviest vehicle and vehicles a day
- Soil CBR if you have it, or the soil type
- The finish you want
- A site photo or layout drawing
Datasheet
| Installed range | Application time | Test data | Product | Product price, for procurement | Reference |
|---|---|---|---|---|---|
| Ground levelling only; no base, infill or concrete; mats reused | Laid and lifted in a day; no curing | Crane-pad trial at a GE wind site | TC Heavy Duty and TC Light Weight · 1000 × 500 × 50 mm · about 6.5 kg per mat · interlocking, top-covered | ₹181–204 / sq ft (₹1,950–2,200 / m²) by order size, ex-works · ex-GST · ex-freight | GE wind site: crane pad and access |
*Installed cost varies with local material availability, labour, transport, base design and site conditions; every site is priced from its own design. Product prices exclude GST (18%) and logistics.
On site



Laying and lifting at a glance
Ground preparation, the geotextile rule for soft ground, the laying and locking sequence, and lifting, cleaning and stacking for the next site, on one page. The full laying and lifting guide comes with your order.
Test data
Crane-pad trial at a GE wind site. Send us the heaviest load and the ground conditions and we confirm the grade and the mat layout before you order.
Ground and water
Mats sit on levelled, compacted ground, over a geotextile where it is soft. Rain runs off the closed surface, so grade the ground to fall and keep it drained.
What would your road or yard cost on GridMats?
An indicative estimate in about a minute, free. Our engineers follow with the design and the bill of quantities against your conventional section; the method statement your contractor will follow comes with your order.
Get my free estimate Talk to an engineer on WhatsApp (opens in a new tab)
