S1 · Cement-treated gravel · Lead system

Light traffic in three days, trucks in seven, and no saw-cut joints

A 40 mm recycled-plastic grid filled with cement-treated chips: a hard, dust-free grey surface for truck yards and plant roads.

Get my free estimate   Download the flier (PDF) (opens in a new tab)   Installation at a glance (PDF) (opens in a new tab)

RINAC, Mumbai: the finished yard in daily use, on OC-LW 40

Installed cost, indicative*₹130–177 / sq ft(₹1,400–1,900 / m²)
Opens to traffic3 days · 7 dayslight vehicles · trucks, once the 7-day cubes reach 2 MPa
Laying rate300–400 m²of grid per crew-day
Product, for procurementOC-HD 40₹84–107/sq ft (₹900–1,150/m²) by order size, ex-works
3 daysto light traffic; trucks at 7, once the cubes pass
0saw-cut joints or dowels
170 t/m²lab compression test, empty OC-HD 40 panel (latest test report)
4.0–6.6 kg/m²recycled plastic reused (OC-LW to OC-HD)

In under 20 seconds

Grid, fill, finished

1Grid laid on the prepared base: OC-LW 40 across the RINAC truck yard, Mumbai
2Crew filling the cells with cement-treated chips: 300–400 m² a day
3Compacted and brushed flush with the cell tops, then moist-cured 3 days

Why it wins

  • Built for trucks up to 49 t gross. The empty OC-HD 40 panel carried 170 t/m² in the latest lab compression test; the pavement itself is designed from your traffic and soil.
  • No saw-cut joints, no dowels. The cells arrest shrinkage cracks, so there is no joint cutting or sealing crew.
  • Light traffic in three days, not four weeks. Moist-cured 3 days; light vehicles at 3 days, trucks at 7 once the 7-day cubes reach 2 MPa. Built bay by bay in shutdown windows.
  • Dust-free, repairable. A hard grey surface that reads as concrete; damaged cells are refilled, not cut out.
  • Designed to the terrain and the rain. Cross-section by topography, drainage by rainfall intensity: plain or steep sites.
  • ESG line item. Per 1,000 m²: 6.6 t of plastic waste reused, and cement only in the 40 mm layer, at 4–6%. The handover file reports the numbers for your site.

Where it fits

Plant and factory roads · truck parking and marshalling yards · solar and wind park internal roads · fire lanes · container yards · township service roads.

Build-up

S1 cross-section

The 40 mm GridMats® grid (OC-HD 40 for trucks, OC-LW 40 for lighter traffic), laid on 20–30 mm of M-sand or crusher-dust bedding over a compacted base and a non-woven geotextile separation layer, and filled with crushed 6–12 mm chips treated with 4–6% cement, plate-compacted and brushed flush. Kerb or edge restraint on both sides; U-nails one per 2–3 m² on roads and slopes, one per 10 m² on flat yards, extra on embankments, edges and cut lines.

Choose S1 when

  • Trucks every day, up to 49 t gross (OC-HD 40; OC-LW 40 for lighter traffic)
  • A hard, dust-free grey surface
  • Light traffic in 3 days and trucks in 7
  • No saw-cut joints to cut, seal or crack

Not ideal when

  • The surface must be fully permeable: choose S2
  • The contract requires asphalt (S5) or a concrete finish (S4)

What we need from you

  • Area: length × width, or m²
  • Location: city or a map pin
  • Heaviest vehicle and vehicles a day
  • Soil CBR if you have it, or the soil type
  • The finish you want
  • A site photo or layout drawing

Get my free estimate

Datasheet

Installed rangeApplication timeTest dataProductProduct price, for procurementReference
₹130–177 / sq ft (₹1,400–1,900 / m²) indicative*300–400 m² of grid per crew-day · light traffic 3 days · trucks 7 days, once the 7-day cubes reach 2 MPa · supply date confirmed with the POLab compression tests on the panel: 170 t/m² empty (latest test report); filled, about 320 t/m² with cold asphalt and 3,200–4,000 t/m² with M25 concrete at 5 days (Stedrant, 2021) · mix designed for a 7-day UCS of 2–3 MPaOC-HD 40 for trucks (459 × 558 × 40 mm, 1.7 kg per panel) · OC-LW 40 for lighter traffic (500 × 500 × 40 mm) · 100% recycled PP₹84–107 / sq ft (₹900–1,150 / m²) OC-HD 40 by order size, ex-works · ex-GST · ex-freightRINAC, Mumbai: cold-storage truck yard on OC-LW 40 with 6% cement, 2025, in daily use

*Installed cost varies with local material availability, labour, transport, base design and site conditions; every site is priced from its own design. The geotextile separation layer is a separate BoQ item, not included. Product prices exclude GST (18%) and logistics.

On site

All S1 photos on one page

Design concept

S1 for estate parking: a design concept

From a recent proposal for a 12-villa estate: 4,000 sq ft (50 × 80 ft) of parking on the 40 mm grid (OC-HD 40 in this proposal; OC-LW 40 also suits car-only traffic) with cement-treated aggregate in the cells, and a Cool Green Wall on the inner face of the boundary wall. The render shows the gravel loose; in S1 it is cement-treated, compacted and brushed flush. Where the client wants a green surface, visitor and overflow bays can be S3 grass and soil, which take cars once the grass is established (4–6 weeks).

Render
Concept visualization: 4,000 sq ft of gravel-filled estate parking, with a Cool Green Wall on the boundary. In S1 the fill is cement-treated, compacted and brushed flush to a hard grey surface

Concept renders from a recent GridMats design proposal, not photographs of a built site. Each site is designed from a survey, and the sizes, loads and finishes are confirmed in the design.

Installation at a glance

The steps, what you need and when it opens, on one page. The installation guide comes by email on request; the SOP, the hold-point checklists and the method statement for your site come with your order. We train your contractor’s team: on site for up to 3 days for orders of 2,000 m² or more once the site is confirmed ready, online at no extra cost below that; on-site training is built into the product rate (one PO).

Download (PDF, 1 page) (opens in a new tab)

Test reports

Bureau Veritas and Stedrant load tests, GreenPro, patent 398992, IIT Hyderabad research. See Engineering.

Drainage and terrain

Designs are customised to geography, rainfall intensity and topography: sub-surface drains sized to the rainfall class, cross-sections for plain and steep terrain.

Defect liability

Defect liability: 1 year (DLP), our standard practice. After the training visit, your team shares project status updates (photographs, test reports, and any roadblocks or challenges) at each hold point and at the intervals set in the project agreement; the DLP applies only when these updates have been shared.

Watch

What would your road or yard cost on GridMats?

A free indicative estimate in about a minute. Our engineers follow with the design and the bill of quantities.

Get my free estimate   Talk to an engineer on WhatsApp (opens in a new tab)

Buying for several sites? One rate for 12 months: the annual rate contract →