S2 · Stone chip, gravel, pebble · Lead system · permeable

Car parks and access roads that open the same day and let the rain through

A 40 mm recycled-plastic grid filled with clean, angular 8–12 mm chips: open the same day, and the rain drains through.

Get my free estimate   Download the flier (PDF) (opens in a new tab)   Installation at a glance (PDF) (opens in a new tab)

Stone chips locked in OC-HD 40 cells

Installed cost, indicative*₹130–177 / sq ft(₹1,400–1,900 / m²)
Opens to trafficSame daynothing to cure
Laying rate300–400 m²of grid per crew-day
Product, for procurementOC-HD 40 or OC-LW 40₹84–107/sq ft (₹900–1,150/m²) or ₹51–64/sq ft (₹550–690/m²), ex-works
Same dayopen to traffic
Drains belowrain managed below the surface
₹133–173/sq ftrecorded (₹1,434–1,866/m²)
170 t/m²lab test, empty OC-HD 40 panel (latest test report)

In under 20 seconds

Grid, fill, finished

1Grid laid and clipped on the prepared base
2Clean angular chips raked into the cells
3Plate-compacted, kerbed and open the same day

Before and after

Before: a dirt yard that pondedAfter: the same yard in S2 stone chipBeforeAfter⇆

Why it wins

  • Open the same day. Nothing to cure; the crew leaves, the traffic arrives.
  • Rain goes through it. Rainfall passes into an open-graded base and sub-surface drains sized to the site’s rainfall; edge and outfall drains where the levels need them.
  • Designed to the terrain and the rain. Cross-section by topography, drainage by rainfall intensity: plain or steep sites.
  • Chips stay in place. Cell confinement controls migration and reduces rutting, on a base designed to the IRC:37 rutting criterion; repairs are a top-up.
  • ESG line item. Per 1,000 m²: 6.6 t of plastic waste reused, no cement, about 870 m³ of rain a year returned to the ground at Bengaluru rainfall.

Where it fits

Car parks and overflow parking · service roads · laydown yards · solar and wind sites · driveways and event grounds.

Build-up

S2 cross-section

OC-HD (trucks) or OC-LW (cars) 40 mm grid on 20–30 mm of M-sand or crusher-dust bedding over a compacted, open-graded base and a non-woven geotextile separation layer, filled with clean angular 8–12 mm chips and plate-compacted. Natural grey, black basalt, white marble or red laterite chips. Kerb or edge restraint; U-nails 1 per 2–3 m² on roads and slopes, 1 per 10 m² on flat yards.

Choose S2 when

  • Car parks, access and service roads
  • Rain should go into the ground rather than into surface drains
  • Opening to traffic the same day
  • A natural stone finish

Not ideal when

  • Grades steeper than 6%, where loose chips can migrate: choose S1
  • Special plant over 49 t or tight turning under heavy loads: choose S1
  • A sealed surface that can be swept clean

What we need from you

  • Area: length × width, or m²
  • Location: city or a map pin
  • Heaviest vehicle and vehicles a day
  • Soil CBR if you have it, or the soil type
  • The finish you want
  • A site photo or layout drawing

Get my free estimate

Datasheet

Installed rangeApplication timeTest dataProductProduct price, for procurementReferences
₹130–177 / sq ft (₹1,400–1,900 / m²) recorded on completed sites, indicative*300–400 m² of grid per crew-day · open the same day · supply date confirmed with the POLab compression tests on the panel: OC-HD 40 170 t/m² empty (latest test report); OC-LW 40 105 / 200 t/m² empty / filled, in-house · infiltration tested at handoverOC-HD 40 for trucks · OC-LW 40 for cars and walkways · the 30 mm grid (GP-30) for paths and campus roads · 100% recycled PP₹84–107 / sq ft (₹900–1,150 / m²) OC-HD · ₹51–64 / sq ft (₹550–690 / m²) OC-LW by order size, ex-works · ex-GST · ex-freightReliance, Rann of Kutch, 2025 · Toyo Engineering Bharuch · Laukik Nasik · SJ Contracts Pune · Garden City University

*Installed cost varies with local material availability, labour, transport, base design and site conditions; every site is priced from its own design. The geotextile separation layer is a separate BoQ item, not included. Product prices exclude GST (18%) and logistics.

On site

Show all 9 photos

All S2 photos on one page

Installation at a glance

The steps, what you need and when it opens, on one page. The installation guide comes by email on request; the SOP, the hold-point checklists and the method statement for your site come with your order. We train your contractor’s team: on site for up to 3 days for orders of 2,000 m² or more once the site is confirmed ready, online at no extra cost below that; on-site training is built into the product rate (one PO).

Download (PDF, 1 page) (opens in a new tab)

Test reports

Bureau Veritas and Stedrant load tests, GreenPro, patent 398992, IIT Hyderabad research. See Engineering.

Drainage and terrain

Designs are customised to geography, rainfall intensity and topography: sub-surface drains sized to the rainfall class, cross-sections for plain and steep terrain.

Defect liability

Defect liability: 1 year (DLP), our standard practice. After the training visit, your team shares project status updates (photographs, test reports, and any roadblocks or challenges) at each hold point and at the intervals set in the project agreement; the DLP applies only when these updates have been shared.

See it go in

Filmed at Garden City University, Bengaluru: a campus road on the 30 mm grid (GP-30) with gravel. Truck yards use the 40 mm heavy-duty grid (OC-HD 40). Sound off by default; turn it on in the player.

Watch

What would your road or yard cost on GridMats?

A free indicative estimate in about a minute. Our engineers follow with the design and the bill of quantities.

Get my free estimate   Talk to an engineer on WhatsApp (opens in a new tab)

Buying for several sites? One rate for 12 months: the annual rate contract →