Systems and products
A system is what gets built: the finish you see, the load it carries, the base and the method. A product is what GridMats supplies for it. Start with the three questions below: they give you a system, its installed cost per square foot and when it opens to traffic. Product prices for procurement teams follow further down.
Cell confinement is not new: it was developed with the US Army Corps of Engineers in the late 1970s and has been used worldwide since. In India, cell-filled concrete pavement is among the new technologies for rural roads under PMGSY. GridMats adds a recycled-plastic grid, tested at IIT Hyderabad and patented in India (Indian Patent 398992).
S1 Cement-treated gravel₹130–177/sq ft (₹1,400–1,900/m²) · light traffic 3 days, trucks 7
S2 Stone chip, gravel, pebble₹130–177/sq ft (₹1,400–1,900/m²) · opens the same day
S3 Grass and soil₹125–167/sq ft (₹1,350–1,800/m²) · vehicles in 4–6 weeks
S4 Honeycomb-finish concreteOn request · full load at 28 days
S5 Grid in base, asphalt on topDesign-specific · your asphalt programme
S6 Temporary roads and surfacesMats ₹181–204/sq ft (₹1,950–2,200/m²) · laid and lifted in a day1 · Find the right GridMats system
Four questions. The answer is your design and price: the system, how it is built, the cost per sq ft and for your whole project, and when it opens. Your free estimate then prices your own site.
Gross vehicle weight. The pavement itself is designed on the axle loads from your axle survey or VDF.
Your design and price
For: Truck yard or plant road · Trucks 25–28 t
Recommended designS1 · Cement-treated gravelOC-HD 40 grid on 20–30 mm bedding over a compacted base and a geotextile separation layer, filled with 6–12 mm chips treated with 4–6% cement and brushed flush; kerb or edge restraint on both sides.
Product: OC-HD 40 at ₹84–107/sq ft (₹900–1,150/m²) by order size, ex-works, ex-GST.
Also fits: S2 Stone chip, gravel, pebble
*Indicative, from completed sites and our cost sheets. Your free estimate prices your own site from its area, soil, rainfall and levels. The geotextile separation layer is a separate BoQ item, not included.
2 · Installed cost and time, system by system
Installed ranges from completed sites and our cost sheets, with the time to traffic. Every site is designed and priced from its own survey.
| System | Installed cost, indicative* | Opens to traffic | Heaviest vehicle | Finish | Product supplied |
|---|---|---|---|---|---|
| S1 Cement-treated gravel lead | ₹130–177/sq ft (₹1,400–1,900/m²) | Light vehicles at 3 days; trucks at 7, once the cubes reach 2 MPa | Vehicles up to 49 t gross | Hard grey, dust-free | OC-HD 40 (trucks) or OC-LW 40 (lighter traffic) |
| S2 Stone chip, gravel, pebble | ₹130–177/sq ft (₹1,400–1,900/m²) | Same day | Cars to trucks | Natural stone, permeable | OC-HD 40 or OC-LW 40; the 30 mm grid for paths and campus roads |
| S3 Grass and soil | ₹125–167/sq ft (₹1,350–1,800/m²) | At once on foot; vehicles in 4–6 weeks | Cars; fire-lane access on a designed base | Green | Grass paver 30 mm (cars), 20 mm (walkways) or OC-LW 40 |
| S4 Honeycomb-finish concrete | On request, priced per site; materials ₹214–265/sq ft (₹2,300–2,850/m²) on our cost sheets | Traffic at 7 days; full traffic at 14 days; full load at 28 days | Trucks up to 49 t gross | Concrete, visible hexagon | OC-HD 40 + concrete |
| S5 Grid at the GSB/WMM interface | Design-specific | Your contractor's asphalt programme | By design | Asphalt | OC-LW 40 (OC-HD 40 for the heaviest) |
| S6 Temporary roads and surfaces | ₹181–204/sq ft (₹1,950–2,200/m²) for the mats, reused site after site; ground levelling and a geotextile only | Same day; lifted and reused | Site traffic, crane pads | Top-covered mats, in colour | TC mats, Heavy Duty or Light Weight |
*Installed cost varies with local material availability, labour, transport, base design and site conditions; every site is priced from its own design. The geotextile separation layer is a separate BoQ item, not included. For comparison, an IRC:58 concrete road runs ₹269–297 per sq ft (₹2,900–3,200 per m²) on our cost sheets and needs about 28 days of curing before full load. Heaviest vehicle is the gross weight; the pavement is designed on the axle loads from your axle survey or VDF. Product prices for procurement are in section 3.
Defect liability: 1 year (DLP), our standard practice. After the training visit, your team shares project status updates (photographs, test reports, and any roadblocks or challenges) at each hold point and at the intervals set in the project agreement; the DLP applies only when these updates have been shared.
3 · Products for procurement
For buyers ordering the grid itself: sizes, lab tests and the price by order size. Most projects start from the installed system cost above. On a project quote the product rate also carries the training of your contractor’s team, so there is one PO. Datasheets are under Resources.


Every product ships with its dimensions, mass, material (100% post-consumer polypropylene for the grids), certificates (GreenPro, patent 398992, PCT WO2023/100191), load tests with the laboratory named, pack size and the lead time confirmed with each purchase order. Terms: 100% advance with the order, GST 18% extra, transport at cost.


| Product | Size · mass | Lab load test on the panel | Used in | Price by order size, ex-GST ex-freight |
|---|---|---|---|---|
| OC-HD 40 | 459 × 558 × 40 mm · 1.7 kg (6.6 kg/m²) | 170 t/m² empty (latest test report) · filled: about 320 t/m² with cold asphalt, 3,200–4,000 t/m² with M25 concrete at 5 days (Stedrant, 2021) | S1, S2, S4, S5 heavy | ₹84–107/sq ft (₹900–1,150/m²) |
| OC-LW 40 | 500 × 500 × 40 mm · ~4 kg/m² | 105 / 200 t/m² empty / filled, in-house; third-party test due Q4 2026 | S1 lighter traffic, S2 cars, S3 soil, S5 | ₹51–64/sq ft (₹550–690/m²) |
| Grass paver 30 / 20 mm | 250 × 250 × 30 mm · ~3 kg/m² | Third-party load test pending | S3; the 30 mm grid also with gravel for paths and campus roads (S2) | ₹40–46/sq ft (₹430–495/m²) (30 mm) ₹34–39/sq ft (₹370–420/m²) (20 mm) |
| TC mats Heavy Duty · Light Weight | 1000 × 500 × 50 mm · about 6.5 kg | Crane test, GE wind site | S6 temporary roads and surfaces, crane pads | ₹181–204/sq ft (₹1,950–2,200/m²) |
| Accessories | U-nails 8 mm, 175 × 100 × 175 mm · geotextile 125–200 gsm on request, a separate BoQ item, not in the system rates | — | All systems | ₹5–10 each · ₹4/sq ft (₹40/m²) |
Load tests are laboratory compression tests on a single panel. They compare panels; the capacity of a pavement comes from the base designed for its traffic and soil.
Product prices by order size
₹ per m², ₹ per sq ft below · ex-works, ex-GST, ex-freight
| Product | Under 1,000 m² under 10,800 sq ft | 1,000–2,500 m² 10,800–26,900 sq ft | 2,500–5,000 m² 26,900–53,800 sq ft | 5,000–25,000 m² 53,800 sq ft–2.7 lakh sq ft | Over 25,000 m² or annual rate contract over 2.7 lakh sq ft |
|---|---|---|---|---|---|
| OC-HD 40 | 1,150 ₹107/sq ft | 990 ₹92/sq ft | 960 ₹89/sq ft | 935 ₹87/sq ft | 900 ₹84/sq ft |
| OC-LW 40 | 690 ₹64/sq ft | 650 ₹60/sq ft | 620 ₹58/sq ft | 590 ₹55/sq ft | 550 ₹51/sq ft |
| Grass paver 30 mm | 495 ₹46/sq ft | 470 ₹44/sq ft | 455 ₹42/sq ft | 440 ₹41/sq ft | 430 ₹40/sq ft |
| Grass paver 20 mm | 420 ₹39/sq ft | 400 ₹37/sq ft | 390 ₹36/sq ft | 380 ₹35/sq ft | 370 ₹34/sq ft |
| TC mats | 2,200 ₹204/sq ft | 2,100 ₹195/sq ft | 2,050 ₹190/sq ft | 2,000 ₹186/sq ft | 1,950 ₹181/sq ft |
The ladder is the base product price. On a project quote, the on-site training of your contractor’s team is built into the product rate: one PO. Online training is at no extra cost. The tier is set by the square metres on one purchase order. A 12-month rate contract for a group, a park or a repeat buyer is priced in the last column whatever the size of each call-off. Prices ex-works Bengaluru; GST 18% and freight extra.
Watch
4 · Beyond the grid
Solar Walkway, sensors, a living wall, pallets, and MLP boards for shuttering, cabins, toilets and furniture, from the same recycled-plastic know-how.
Tested, patented, in service
The numbers engineers ask for first
What 1,000 m² of GridMats road puts in your ESG report
Indicative; every handover file reports the numbers for the client's own site.
What would your road or yard cost on GridMats?
A free indicative estimate in about a minute. Our engineers follow with the design and the bill of quantities.
Get my free estimate Talk to an engineer on WhatsApp (opens in a new tab)
Buying for several sites? One rate for 12 months: the annual rate contract →


GridMats Solar Walkway
GridMats IoT
Cool Green Wall
Pallets and MLP boards
MLP boards