Home › Projects › GE wind site

S6 · Temporary roads and surfaces

GE wind site

GE · Wind site · Wind energy

Top-covered mats under a crane on a wind site: laid and lifted in a day.

Use case: Crane pad and access. Saving per m², indicative: Concrete or WBM pad avoided; mats reused.

About S6  Estimate a similar site

GE wind site

From the site

The brief

What the client needed, the ground and the traffic. Written with the client's approval before publication.

What was built

Layers, product, crew-days, opening date; from the register and the handover file.

What we would specify today

The current system and drainage provisions for the same site.

What would your road or yard cost on GridMats?

An indicative estimate in about a minute, free. Our engineers follow with the design and the bill of quantities against your conventional section; the method statement your contractor will follow comes with your order.

Get my free estimate   Talk to an engineer on WhatsApp (opens in a new tab)