S5 · Grid at the GSB/WMM interface, asphalt on top
Orxa Energies, Bengaluru
Orxa Energies · Bengaluru, Karnataka · Electric mobility · 2022
Campus road and parking with OC-HD 40 at the WMM/GSB interface as a rut-resistance layer under the asphalt, built by the client's contractor on its normal schedule.
Use case: Campus road under asphalt. Saving per m², indicative: Up to ₹23/sq ft (₹250/m²) at parity rates, 14% less material.

The road and parking from above
From the site


What would your road or yard cost on GridMats?
A free indicative estimate in about a minute. Our engineers follow with the design and the bill of quantities.
Get my free estimate Talk to an engineer on WhatsApp (opens in a new tab)
Buying for several sites? One rate for 12 months: the annual rate contract →