Home › Projects › Orxa Energies, Bengaluru

S5 · Grid at the GSB/WMM interface, asphalt on top

Orxa Energies, Bengaluru

Orxa Energies · Bengaluru, Karnataka · Electric mobility · 2022

Campus road and parking with OC-HD 40 at the WMM/GSB interface as a rut-resistance layer under the asphalt, built by the client's contractor on its normal schedule.

Use case: Campus road under asphalt. Saving per m², indicative: Up to ₹23/sq ft (₹250/m²) at parity rates, 14% less material.

About S5  Estimate a similar site

Orxa Energies, Bengaluru: The road and parking from above

The road and parking from above

From the site

What would your road or yard cost on GridMats?

A free indicative estimate in about a minute. Our engineers follow with the design and the bill of quantities.

Get my free estimate   Talk to an engineer on WhatsApp (opens in a new tab)

Buying for several sites? One rate for 12 months: the annual rate contract →