Home › Applications › EPC and temporary works

EPC and temporary works · S6 · S2

Crane pads and temporary access that move with the crew

Get my free estimate   Flier (PDF) (opens in a new tab)

Top-covered mats (S6): a reusable temporary track over soft ground

What we supply

  • S6 top-covered mats for temporary roads, crane pads and laydown, reusable.
  • S2 for haul roads that stay after the job.

Why it is used

  • Laid and lifted in a day.
  • No concrete pads to break out.
Reference

GE wind-site crane test.

What would your road or yard cost on GridMats?

An indicative estimate in about a minute, free. Our engineers follow with the design and the bill of quantities against your conventional section; the method statement your contractor will follow comes with your order.

Get my free estimate   Talk to an engineer on WhatsApp (opens in a new tab)