Home › Applications › Mining and quarries
Mining and quarries · S1 · S6 · S2
Haul roads, loading areas and equipment zones that stay usable through the monsoon

S1 cement-treated gravel under the roller: the haul-road system
What we supply
- S1 cement-treated gravel for haul roads, loading areas, weighbridge approaches and heavy-equipment zones.
- S6 top-covered mats for temporary access and moving work faces: deploy, reinforce, remove, repeat.
- S2 permeable stone chip for parking, storage yards and colony roads.
Why it is used
- No concrete to cure on a remote site; S1 takes trucks at seven days, once the 7-day cubes reach 2 MPa.
- Mats move with the work face and are reused.
- The cells hold the base on slopes and embankments against erosion.
Reference
S1 at RINAC, Mumbai (truck yard) and S6 crane pads on a GE wind site; mine roads are designed from the same load tables.
What would your road or yard cost on GridMats?
An indicative estimate in about a minute, free. Our engineers follow with the design and the bill of quantities against your conventional section; the method statement your contractor will follow comes with your order.
Get my free estimate Talk to an engineer on WhatsApp (opens in a new tab)
