Home › Applications › Public infrastructure and smart cities

Public infrastructure and smart cities · S1 · S2 · S3

Footpaths, cycle lanes, plazas and parks that drain and last

Get my free estimate

Download the S2 stone-chip flier (PDF, 440 KB) (opens in a new tab)

RMZ Ecoworld, Bengaluru: the road to the Outer Ring Road, built with recycled-plastic GridMats in 2022

RMZ Ecoworld, Bengaluru: the road to the Outer Ring Road, built with recycled-plastic GridMats in 2022

What we supply

  • S2 and S3 permeable footpaths, cycle lanes, plazas and parks.
  • S1 for bus depots, bus bays, service yards and parking.

Why it is used

  • Permeable surfaces cut waterlogging and runoff.
  • No saw-cut joints; cell confinement reduces rutting.
Reference

Bengaluru road between Ecoworld and the Outer Ring Road, built with recycled-plastic GridMats in 2022 (The Hindu; Commercial Design).

What would your road or yard cost on GridMats?

A free indicative estimate in about a minute. Our engineers follow with the design and the bill of quantities.

Get my free estimate   Talk to an engineer on WhatsApp (opens in a new tab)

Buying for several sites? One rate for 12 months: the annual rate contract →