Home › Applications › Public infrastructure and smart cities
Public infrastructure and smart cities · S1 · S2 · S3
Footpaths, cycle lanes, plazas and parks that drain and last
Download the S2 stone-chip flier (PDF, 440 KB) (opens in a new tab)

RMZ Ecoworld, Bengaluru: the road to the Outer Ring Road, built with recycled-plastic GridMats in 2022
What we supply
- S2 and S3 permeable footpaths, cycle lanes, plazas and parks.
- S1 for bus depots, bus bays, service yards and parking.
Why it is used
- Permeable surfaces cut waterlogging and runoff.
- No saw-cut joints; cell confinement reduces rutting.
Reference
Bengaluru road between Ecoworld and the Outer Ring Road, built with recycled-plastic GridMats in 2022 (The Hindu; Commercial Design).
What would your road or yard cost on GridMats?
A free indicative estimate in about a minute. Our engineers follow with the design and the bill of quantities.
Get my free estimate Talk to an engineer on WhatsApp (opens in a new tab)
Buying for several sites? One rate for 12 months: the annual rate contract →