S1 · Cement-treated gravel · Lead system
Light traffic in three days, trucks in seven, and no saw-cut joints
A 40 mm recycled-plastic grid filled with cement-treated chips: a hard, dust-free grey surface for truck yards and plant roads.
Moist-cured 3 days; light vehicles at 3 days, trucks at 7, once the 7-day cubes reach 2 MPa. Built bay by bay in shutdown windows.


Layers, from the top

Kerb or edge restraint on both sides; U-nails one per 2–3 m² on roads and slopes, one per 10 m² on flat yards, extra on embankments, edges and cut lines.
- cement-treated 6-12 mm chips, filled flush, brushed
- OC-HD 40 grid
- 20-30 mm M-sand / crusher-dust bedding
- WMM / GSB base, 100-250 mm by load class
- Base thickness from the GridMats design engine.
- Base drawn at one height.
- The base does not change with the grid. For each kind of traffic, the layers below are the same on both grids. The traffic and the soil set them.
- Non-woven geotextile separation layer, 125-200 gsm, on the subgrade
- Compacted subgrade, 98% MDD, level +/-10 mm
Choose when
- Trucks every day, up to 49 t gross (OC-HD 40; OC-LW 40 for lighter traffic)
- A hard, dust-free grey surface
- Light traffic in 3 days and trucks in 7
- No saw-cut joints to cut, seal or crack
the pavement itself is designed from your traffic and soil.
Where it fits
Plant and factory roads · truck parking and marshalling yards · solar and wind park internal roads · fire lanes · container yards · township service roads.
Bay by bay
Work in bays. The grid goes down one bay at a time, so part of the yard stays in use while the next part is built. Plan the bays around the gates and the loading docks.
Where the rain goes
- Across a 2% cross-fall to the edges
- French drains with a perforated pipe along both edges, two outfalls
Designed to the terrain and the rain. Cross-section by topography, drainage by rainfall intensity: plain or steep sites.
ESG line item.
Per 1,000 m²: 6.6 t of plastic waste reused, and cement only in the 40 mm layer, at 4–6%.
Indicative; every handover file reports the numbers for the client's own site.
Step by step
Subgrade
Compacted subgrade, 98% MDD, level +/-10 mm
Separation layer
Non-woven geotextile separation layer, 125-200 gsm, on the subgrade
Base
WMM / GSB base, 100-250 mm by load class
Base thickness from the GridMats design engine.
Kerbs
Kerb / edge restraint
Bedding
20-30 mm M-sand / crusher-dust bedding
Grid
OC-HD 40 for trucks, OC-LW 40 for lighter traffic
Work in bays. The grid goes down one bay at a time, so part of the yard stays in use while the next part is built. Plan the bays around the gates and the loading docks.
U-nails one per 2–3 m² on roads and slopes, one per 10 m² on flat yards, extra on embankments, edges and cut lines.
Fill
filled with crushed 6–12 mm chips treated with 4–6% cement, plate-compacted and brushed flush
Cure
Compacted and brushed flush with the cell tops, then moist-cured 3 days
Day 3
Light traffic in three days, not four weeks.
light vehicles on day 3; trucks on day 7, once the 7-day cubes reach 2 MPa
Day 7
Small cubes of a cement mix are made on site and crushed in a laboratory after 7 or 28 days to check their strength. An S1 surface opens to trucks once its 7-day cubes reach 2 MPa.
Agree the strength check. On S1, trucks go on at 7 days only once the 7-day cubes reach 2 MPa. Cast the cubes on the day of the work and book the test in advance.
Real sites

RINAC, Mumbai
Cold-storage truck yard rebuilt in cement-treated gravel (6% cement) during a shutdown window; light traffic at three days, trucks at seven once the 7-day cubes reach 2 MPa; in daily use under reefer trucks since. The reference site for S1.
Read the case