GridMats® · recycled-plastic ground grids

Gravel, chips or grass.

Filled to suit your traffic, drainage and budget.

32 sites in 12 states

S1 · Cement-treated gravel · Lead system

Light traffic in three days, trucks in seven, and no saw-cut joints

A 40 mm recycled-plastic grid filled with cement-treated chips: a hard, dust-free grey surface for truck yards and plant roads.

Moist-cured 3 days; light vehicles at 3 days, trucks at 7, once the 7-day cubes reach 2 MPa. Built bay by bay in shutdown windows.

Crew filling the cells with cement-treated chips: 300–400 m² a day
Crew filling the cells with cement-treated chips: 300–400 m² a day
Compacted and brushed flush with the cell tops, then moist-cured 3 days
Compacted and brushed flush with the cell tops, then moist-cured 3 days

Layers, from the top

Build-up drawing
Build-up drawing
Kerb / edge restraint

Kerb or edge restraint on both sides; U-nails one per 2–3 m² on roads and slopes, one per 10 m² on flat yards, extra on embankments, edges and cut lines.

  1. cement-treated 6-12 mm chips, filled flush, brushed
  2. OC-HD 40 grid
  3. 20-30 mm M-sand / crusher-dust bedding
  4. WMM / GSB base, 100-250 mm by load class
    • Base thickness from the GridMats design engine.
    • Base drawn at one height.
    • The base does not change with the grid. For each kind of traffic, the layers below are the same on both grids. The traffic and the soil set them.
  5. Non-woven geotextile separation layer, 125-200 gsm, on the subgrade
  6. Compacted subgrade, 98% MDD, level +/-10 mm

Choose when

  • Trucks every day, up to 49 t gross (OC-HD 40; OC-LW 40 for lighter traffic)
  • A hard, dust-free grey surface
  • Light traffic in 3 days and trucks in 7
  • No saw-cut joints to cut, seal or crack

the pavement itself is designed from your traffic and soil.

Where it fits

Plant and factory roads · truck parking and marshalling yards · solar and wind park internal roads · fire lanes · container yards · township service roads.

Bay by bay

Work in bays. The grid goes down one bay at a time, so part of the yard stays in use while the next part is built. Plan the bays around the gates and the loading docks.

Where the rain goes

  • Across a 2% cross-fall to the edges
  • French drains with a perforated pipe along both edges, two outfalls

Designed to the terrain and the rain. Cross-section by topography, drainage by rainfall intensity: plain or steep sites.

ESG line item.

Per 1,000 m²: 6.6 t of plastic waste reused, and cement only in the 40 mm layer, at 4–6%.

Indicative; every handover file reports the numbers for the client's own site.

Step by step

  1. Subgrade

    Compacted subgrade, 98% MDD, level +/-10 mm

  2. Separation layer

    Non-woven geotextile separation layer, 125-200 gsm, on the subgrade

  3. Base

    WMM / GSB base, 100-250 mm by load class

    Base thickness from the GridMats design engine.

  4. Kerbs

    Kerb / edge restraint

  5. Bedding

    20-30 mm M-sand / crusher-dust bedding

  6. Grid

    OC-HD 40 for trucks, OC-LW 40 for lighter traffic

    Work in bays. The grid goes down one bay at a time, so part of the yard stays in use while the next part is built. Plan the bays around the gates and the loading docks.

    U-nails one per 2–3 m² on roads and slopes, one per 10 m² on flat yards, extra on embankments, edges and cut lines.

  7. Fill

    filled with crushed 6–12 mm chips treated with 4–6% cement, plate-compacted and brushed flush

  8. Cure

    Compacted and brushed flush with the cell tops, then moist-cured 3 days

  9. Day 3

    Light traffic in three days, not four weeks.

    light vehicles on day 3; trucks on day 7, once the 7-day cubes reach 2 MPa

  10. Day 7

    Small cubes of a cement mix are made on site and crushed in a laboratory after 7 or 28 days to check their strength. An S1 surface opens to trucks once its 7-day cubes reach 2 MPa.

    Agree the strength check. On S1, trucks go on at 7 days only once the 7-day cubes reach 2 MPa. Cast the cubes on the day of the work and book the test in advance.

Real sites

RINAC, Mumbai: the finished yard in daily use

RINAC, Mumbai

Cold-storage truck yard rebuilt in cement-treated gravel (6% cement) during a shutdown window; light traffic at three days, trucks at seven once the 7-day cubes reach 2 MPa; in daily use under reefer trucks since. The reference site for S1.

Read the case

Videos

S2 · Stone chip, gravel, pebble · Lead system · permeable

Car parks and access roads that open the same day and let the rain through

A 40 mm recycled-plastic grid filled with clean, angular 8–12 mm chips: open the same day, and the rain drains through.

Open the same day. Nothing to cure; the crew leaves, the traffic arrives.

Grid laid and clipped on the prepared base
Grid laid and clipped on the prepared base
Clean angular chips raked into the cells
Clean angular chips raked into the cells
Stone chips locked in OC-HD 40 cells
Stone chips locked in OC-HD 40 cells

Layers, from the top

Build-up drawing
Build-up drawing
Kerb / edge restraint

Kerb or edge restraint; U-nails 1 per 2–3 m² on roads and slopes, 1 per 10 m² on flat yards.

  1. 8-12 mm angular chips, plate-compacted
  2. OC-HD 40 grid
  3. 20-30 mm M-sand / crusher-dust bedding
  4. Open-graded GSB / WMM base, 0-250 mm by load class
    • Base thickness from the GridMats design engine.
    • Base drawn at one height.
    • The base does not change with the grid. For each kind of traffic, the layers below are the same on both grids. The traffic and the soil set them.
  5. Non-woven geotextile separation layer, 125-200 gsm, on the subgrade
  6. Compacted subgrade, 98% MDD (95% for car parks)

Choose when

  • Car parks, access and service roads
  • Rain should go into the ground rather than into surface drains
  • Opening to traffic the same day
  • A natural stone finish

Where it fits

Car parks and overflow parking · service roads · laydown yards · solar and wind sites · driveways and event grounds.

Where the rain goes

Rain goes through it. Rainfall passes into an open-graded base and sub-surface drains sized to the site’s rainfall; edge and outfall drains where the levels need them.

≈870 m³ of rain a year goes back into the ground through every 1,000 m² of permeable S2 or S3 surface, at Bengaluru rainfall.

A shallow water table or a clay that holds water changes the design: a geotextile and a drainage layer go in, and on a site that cannot take water into the ground, S2 and S3 drain to the outfalls through the pipes.

perforated pipes along the low edges to the outfalls

Permeable Lets rainwater soak through the surface into the ground instead of running off.

ESG line item.

Per 1,000 m²: 6.6 t of plastic waste reused, no cement, about 870 m³ of rain a year returned to the ground at Bengaluru rainfall.

0 °C · 0 litres no heated mix, no curing water on S2 and S3

Indicative; every handover file reports the numbers for the client's own site.

Step by step

  1. Subgrade

    Compacted subgrade, 98% MDD (95% for car parks)

    Compact the existing soil A roller consolidates the natural ground

  2. Separation layer

    Non-woven geotextile separation layer, 125-200 gsm, on the subgrade

    Lay the separation layer 125 GSM geotextile over the compacted soil

  3. Base

    Open-graded GSB / WMM base, 0-250 mm by load class

    Base thickness from the GridMats design engine.

  4. Kerbs

    Kerb / edge restraint

  5. Bedding

    20-30 mm M-sand / crusher-dust bedding

    Spread the bedding A levelled layer of M-sand

  6. Grid

    Grid laid and clipped on the prepared base

    OC-HD (trucks) or OC-LW (cars) 40 mm grid

    U-nails 1 per 2–3 m² on roads and slopes, 1 per 10 m² on flat yards.

  7. Fill

    Clean angular chips raked into the cells

    8-12 mm angular chips, plate-compacted

  8. Open

    Plate-compacted, kerbed and open the same day

    Open the same day. Nothing to cure; the crew leaves, the traffic arrives.

    Open to vehicles Traffic runs on it as soon as it is compacted

Real sites

The road at the site office

Reliance Industries, Rann of Kutch

Access road on saline flat ground, OC-HD with 8–12 mm chips, designed for low CBR and checked in IITPAVE; opened to traffic the day it was filled.

Read the case
Toyo Engineering, Bharuch: stone chips going into the grid beside the kerb

Toyo Engineering, Bharuch

Kerbed entrance road with stone-chip infill on M-sand bedding, opened the same afternoon.

Read the case
Garden City University, Bengaluru: kerbed campus road on the 30 mm grid with gravel

Garden City University, Bengaluru

Garden City University, Bengaluru: kerbed campus road on the 30 mm grid with gravel

Videos

The process film, chapter by chapter

Filmed at Garden City University, Bengaluru: a campus road on the 30 mm grid (GP-30) with gravel. Truck yards use the 40 mm heavy-duty grid (OC-HD 40).
Filmed at Garden City University, Bengaluru: a campus road on the 30 mm grid (GP-30) with gravel. Truck yards use the 40 mm heavy-duty grid (OC-HD 40).
  1. Compact the existing soil A roller consolidates the natural ground
  2. Lay the separation layer 125 GSM geotextile over the compacted soil
  3. Spread the bedding A levelled layer of M-sand
  4. Lay the GridMats panels 30 mm grid panels of recycled plastic, clipped together
  5. Fill and compact Gravel into the cells, a plate compactor, then the roller
  6. Open to vehicles Traffic runs on it as soon as it is compacted
  7. Before and after The same track: dirt to gravel road
Watch the film on the S2 page

S3 · Grass and soil · Lead system · green

Fire lanes, overflow parking and paths that stay green

Recycled-plastic grass pavers, 30 mm for cars and fire lanes on a base we design, 20 mm for walkways: grass grows through and the roots stay uncrushed.

Foot traffic at once, vehicles once the grass is 60 mm and rooted (4–6 weeks).

Paver panels go down edge to edge on sand bedding
Paver panels go down edge to edge on sand bedding
Root zone filled; the grass starts to close over
Root zone filled; the grass starts to close over
Grass closed over: part the turf and the paver is just beneath
Grass closed over: part the turf and the paver is just beneath

Layers, from the top

Build-up drawing
Build-up drawing
Kerb / edge restraint

Edge restraint all round; U-nails on slopes and at edges.

  1. filled with a sandy root-zone mix and seeded or turfed
  2. sandy root-zone mix
  3. GP-30 grass paver, 30 mm: for cars and fire-lane access
  4. 20-30 mm sharp sand bedding
  5. Open-graded GSB base, 0-150 mm by load class
    • Base thickness from the GridMats design engine.
    • Base drawn at one height.
    • Grass grows through the cells; the base we design takes the wheel load, and the paver keeps the roots uncrushed.
  6. Non-woven geotextile separation layer, 200 gsm, on the subgrade
  7. Compacted subgrade, 95% MDD

Choose when

  • Fire-lane access, overflow and visitor parking on a base we design
  • Walkways and lawns: GP-20 for feet, GP-30 where cars drive
  • A surface that stays green and lets rain into the ground

Where it fits

Fire lanes on a base we design · overflow and visitor parking · amphitheatres and event lawns · walkways and drain margins · resort drives.

Where the rain goes

Supports green-cover rules and permeable-area requirements, subject to local approvals; drains like a lawn.

≈870 m³ of rain a year goes back into the ground through every 1,000 m² of permeable S2 or S3 surface, at Bengaluru rainfall.

A shallow water table or a clay that holds water changes the design: a geotextile and a drainage layer go in, and on a site that cannot take water into the ground, S2 and S3 drain to the outfalls through the pipes.

with perforated pipes along the low edges to the outfalls

Permeable Lets rainwater soak through the surface into the ground instead of running off.

ESG line item.

Per 1,000 m²: 3 t of plastic waste reused, 1,000 m² of green cover kept, about 870 m³ of rain a year infiltrated.

0 °C · 0 litres no heated mix, no curing water on S2 and S3

Indicative; every handover file reports the numbers for the client's own site.

Step by step

  1. Subgrade

    Compacted subgrade, 95% MDD

  2. Separation layer

    Non-woven geotextile separation layer, 200 gsm, on the subgrade

  3. Base

    Open-graded GSB base, 0-150 mm by load class

    Base thickness from the GridMats design engine.

  4. Edges

    Edge restraint all round; U-nails on slopes and at edges.

  5. Bedding

    20-30 mm sharp sand bedding

  6. Pavers

    Paver panels go down edge to edge on sand bedding

    Walkways and lawns: GP-20 for feet, GP-30 where cars drive

  7. Fill

    Root zone filled; the grass starts to close over

    filled with a sandy root-zone mix and seeded or turfed

  8. Grass

    Grass closed over: part the turf and the paver is just beneath

    Foot traffic at once, vehicles once the grass is 60 mm and rooted (4–6 weeks).

    plan the planting for the grass to root before the lane is needed

    Mow and water; no resurfacing, no repainting.

Real sites

Svamitva Floresta, Bengaluru

Svamitva Floresta, Bengaluru

Grass-top GridMats roads through a landscaped township plot, in service since 2021; the roots stay uncrushed under cars.

Read the case
Waters India, Bengaluru: amphitheatre and event lawn

Waters India, Bengaluru

Amphitheatre and event lawn in grass pavers: foot traffic from day one, mowed like a lawn.

Videos

GridMats S3 in 18 seconds: soil and grass in the cells, a green road in Bengaluru and grass-paver paths
GridMats S3 in 18 seconds: soil and grass in the cells, a green road in Bengaluru and grass-paver paths
Watch on the system page

Six more systems

Honeycomb-finish concrete
Aditya Birla, National Park Guindy, Chennai: honeycomb finish between kerbs, concrete flush with the cell tops

S4 · Honeycomb-finish concrete

On request · built by teams we train

The visible-hexagon concrete road, built flush by teams we train

Full system pageRead the case

Grid in base, asphalt on top
Orxa Energies: the campus road two years on, in 2024

S5 · Grid in base, asphalt on top

Keep your asphalt

Keep your asphalt; the grid goes in the base.

Full system pageRead the case

Temporary roads and surfaces
GE wind site: a loaded truck on the yellow mats

S6 · Temporary roads and surfaces

Reusable · top-covered mats

Down in a day, lifted for the next site.

Full system pageRead the case

GridMats Solar Walkway
Prototype, October 2026: the solar glass module on GridMats

GridMats Solar Walkway

Energy-generating walkways · pilot stage

Walkways that carry people and produce electricity

Full system page

Cool Green Wall
The Cool Green Wall on the auditorium walls at Conscious Collective 2025, Vikhroli, Mumbai, 13 December 2025

Cool Green Wall

Living wall with smart cooling

Recycled-plastic GridMats panels with built-in sensors and misting, and a live dashboard.

Full system page

Pallets and MLP boards
MLP boards stacked on site: the speckled face is the pressed plastic

Pallets and MLP boards

From multilayer plastic waste

Pallets and plywood-substitute boards made from multilayer plastic waste

Full system page

What would your road or yard cost on GridMats?

Tell us about your site. Our engineers send the design and the cost.

What we need from you

  • Area: length × width, or m²
  • Location: city or a map pin
  • Heaviest vehicle; trucks and buses a day
  • Soil CBR if you have it, or the soil type
  • The finish you want
  • A site photo or layout drawing

Get my free estimateTalk to an engineer on WhatsApp (opens in a new tab)